GRD · ACCESS VERIFIED

Email verified.

Loading your session and opening the full-screen compiler.

The crew is hiring →

Technology for the people who build.

Verified email · No password
See Grade compile a project
Grade · Construction Platform Est. 2023 → Future
01Grade compiler · under construction A computational model of construction. Model the job once—cost, quantities, sequencing, engineering, logistics, and change orders all compute themselves. Live system · Rev 1
Juniper Ridge Field House One compiled truth / Five live views / Rev 1
SELECTED VIEW / 00

One model controls the project.

Build once. Plans, schedule, materials, cost, and logistics update from the same data.

MODEL_01 LIVE COMPILE 5 COORDINATED VIEWS
MODEL_01Plans + sheets derived 01 / EARTHWORK + MASS BALANCE02 / UNDERGROUND03 / FOUNDATIONS04 / WALL FRAMING05 / ENCLOSURE06 / ROOF ASSEMBLY07 / COMPILED MODEL MACHINE-CONTROL CUT64 CY cut · 22 CY reuse · 42 CY exportLIVE CUT GRID · 0 CONFLICTS Live compile COMPILE0.18s 01 / COORDINATED PLANMODEL SYNC A2.1COMPILED FROM MODEL_01ISSUED REV 070 CONFLICTS A2.1 · COORDINATED SITE + SYSTEMS PLAN DERIVED FROM MODEL_01 · REV 07 LIVING / WORK CORE BED MEP 98.42 98.18 40'-0" 25'-7" N A W1 · CW 1" / 62 PSI S1 · SAN 4" / 2% E1 · 200A / 240V EARTHWORK · 64 CY CUT · 22 CY REUSE · 42 CY EXPORT A / WALL + VENTED ATTIC 01 · R-49 + VENT BAFFLE 02 · 5/8" TYPE X 03 · 2x6 / R-21 04 · OSB + WRB + FC 05 · MEP ABOVE CEILING A2.1 JUNIPER RIDGE FIELD HOUSE COORDINATED SITE + SYSTEMS PLAN 1:50SCALE 07REV COMPILED CIVILARCHSTRUCTELECPLUMBMECH A2.1 · MODEL-SYNCEDSITE + ARCH + MEP + ASSEMBLY 02 / LIVE SEQUENCESYNC DERIVED FROM MODEL_01LIVE DEPENDENCY GRAPH · CRITICAL PATHFS LINKS · 0 BROKEN 01Survey + controlsSITE · FIELD CREWSTARTD01 02Strip + rough gradeEARTHWORK · DOZERFS +0D01–02 03Water serviceUTILITIES · CREW C1FS +0D04–05 04Sanitary serviceUTILITIES · CREW C1FS +0D05–07 05Test + backfillQA · EXCAVATORFS +0D07–08 06Form perimeterFOUNDATION · FORMSFS +1D09–10 07Rebar + embedsFOUNDATION · IRONWORKFS +0D10–12 RECOMPUTE EVENT2 tasks moved · crew conflict removed 142 tasks3 links recomputed 03 / LIVE BOMSYNC COMPILED FROM MODEL_01 · MATERIAL TAKEOFFLOCAL SOURCE MATCHING LINEITEM / SPECQTYSUGGESTED LOCAL SOURCEUNITEXTACTION M001Aggregate base · Type II84 TNNevada Materials · 11.5 mi$31.40$2,638 M002Erosion control · 12 in428 LFSiteOne · 6.8 mi$1.86$796 M003Construction fuel · dyed01 TKFlyers Energy · 4.1 mi$1,240$1,240 RUNNING MATERIAL TOTAL61 LINES · 9 LOCAL SOURCES$4,674 89 assembliesPO-014 revised 04 / LOGISTICSSYNC DERIVED FROM MODEL_01 · DAYD01 EARTH MOVED0 / 64 CY WASTE0.0 TN CARBON0.00 tCO₂e EQUIPMENT4 ASSET-DAYS FUEL · ULSD · EIA WEEKLY0 GAL · $0 TWO-ZONE DAILY SITE PLAN42% CAPACITY · 0 COLLISIONS 01 / OPERATIONSCREW · EQUIPMENT · TOOLS · WASTE 02 / MATERIAL CONTROLRECEIVE · STAGE · CONSUME CRSite crew · 58.0 hr shift EQD6 dozer · ownedExcavator · rented D01–04 TLRTK rover · compactorChecked in · 0 conflicts ACTIVE-WAVE BOM FAMILY EARTHWORK + CONTROLS COMPOST SOCK · 428 LF · SLOT A-03 GATE 01 · CONTROLLED INBOUND DAILY MATERIAL CONTROL01 / SITE90 BOM LINES TRACKED ALL-MATERIAL LEDGERON HAND → USED → REMAIN M001Aggregate base84 TN84 REM M00212 in compost sock428 LF428 REM M003ULSD fuel86 GAL86 REM M0044 in SDR-35 coupling18 EA18 REM M005#8 structural screw5,000 EA5,000 REM M006Wire staples800 EA800 REM Nevada Materials11.5 mi · end dump18 TNBOOKED SiteOne Landscape6.8 mi · flatbed428 LFREADY Flyers Energy4.1 mi · service truck1 TANKHELD 01Site + utilitiesD01–08 02StructureD09–27 03EnclosureD28–41 04MEP + closeoutD42–57 3 deliveriesLoad 02 optimized
GRD · Building since 2024 → Careers
Get in touch

For the people who figure it out.

Talk to us